【24h】

A practical method for the management of road runoff

机译:道路径流管理的实用方法

获取原文

摘要

In this paper we outline a conceptual and methodological approach to evaluating the impacts off unsealed forest roads on in-stream water quality based upon the principal of hydrological connectivity,. The methodology is based on the Vbt5 model of Hairsine et al (2002) and makes use of simple empirical relationships that only require input data that are generally available or relatively easily to obtain, such as the road contributing area to drains and the distance from drain outlets to the streams. Using a plantation forestry catchment in the Australian Capital Territory, we demonstrate that the degree of connectivity along a road network is affected by the spatial distribution of the runoff delivery pathways Furthermore, we illustrate how the methodology can be used to extract practical guidelines for appropriate drain spacing and to develop risk assessment maps to assist in prioritizing roads for removal or relocation.
机译:在本文中,我们概述了一种概念和方法论方法,以评估基于水文连通性的原理对没有封闭的森林公路对流水质的影响。该方法基于Haysine等人(2002)的VBT5模型,利用简单的经验关系,只需要通常可用的输入数据或相对容易地获得,例如道路贡献区域和漏极的距离到溪流的网点。在澳大利亚资本领域使用种植林流域,我们证明沿路网络的连接程度受到径流传递途径的空间分布的影响,我们说明了如何使用方法来提取适当排水的实用指南间隔和开发风险评估地图,以协助详尽的道路进行拆卸或搬迁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号