首页> 外文会议>American Society for Engineering Education Annual Conference and Exposition >A Collaborative Learning Method for Construction Project Delivery Methods
【24h】

A Collaborative Learning Method for Construction Project Delivery Methods

机译:建筑项目交付方法的协作学习方法

获取原文

摘要

Developing the understanding of construction project delivery methods is one of the major objectives of Construction Management course. This course has been offered by the author for the last three academic years at the University of Texas at San Antonio. The course is lecture-based. The lecture-based course usually leans towards being instructor centered. Recognizing this fact, the author has developed different strategies every semester to keep the lecture more interactive and student-centered. The strategies included from group studies to company interviews and presentations. According to the author's personal experience, traditional homework assignments are not as effective as team-based assignments in a lecture-based management course. Embedding people's skills requires team-based collaborative exercises. In order to enhance students' learning, rather than having traditional homework assignments, different quiz assignments have been designed for the course. The last semester, the author has decided to explore in addition to the lecture, if collaborative working exercises can be effective in learning. The construction project delivery methods topic is used for the collaborative working exercise. First, the delivery methods are presented in a traditional lecture. The Engineering News Record (ENR) Top Lists of Design-Build, Construction Management at Risk, and Construction Management for Fee type of delivery methods are made available to students. Later, they are asked to make a group of five people and investigate those companies' websites in a detailed manner. They are supposed to find out the reasons why these companies became the leaders in respective project delivery methods. They are asked to come up with their own construction company and develop an argument for the audience explaining how their company became one of the leaders in respective project delivery methods. They are also asked to explain their approach (involvement) from initiation to completion of projects by being specific and giving examples of projects from different industry segments. During presentations, the instructor guides them on presentation skills as well. The team based, collaborative working approach creates interaction among students, enhances communication. They enjoy creating together. The results of the evaluation are expected that in addition to traditional lecture, the team based work study approach enhances the understanding of the project delivery methods; students get the chance to work in a team environment, learn by collaborating, and develop leadership skills.
机译:制定对建筑项目交付方法的理解是建设管理课程的主要目标之一。本课程由作者在圣安东尼奥德克萨斯大学的最后三个学年提供。该课程是基于讲座的。基于讲座的课程通常倾向于被指导者为中心。认识到这一事实,作者每学期都开发了不同的策略,以保持讲座更具互动和以学生为中心的。集团研究中包含的策略与公司访谈和演示。根据提交人的个人经验,传统的家庭作业并不像基于讲座的管理课程中基于团队的任务一样有效。嵌入人们的技能需要基于团队的协作练习。为了提高学生的学习,而不是拥有传统的家庭作业,为课程设计了不同的测验作业。最后一个学期,如果合作工作练习在学习方面可以有效,提交人决定探索。建设项目交付方法主题用于协作工作练习。首先,递送方法以传统的讲座提出。工程新闻记录(REAR)设计建设,风险施工管理的顶级列表,以及费用类型的交付方式的施工管理。后来,他们被要求制作一组五个人,并以详细的方式调查这些公司的网站。他们应该找出这些公司在各自的项目交付方法中成为领导者的原因。他们被要求提出自己的建筑公司,并为观众制定争论,解释他们的公司如何成为各自项目交付方法中的领导者之一。他们还被要求通过具体和赋予不同行业细分项目的项目来解释他们的方法(参与)从开始完成项目。在演示过程中,教师也指导他们的演示技能。基于团队的合作工作方法会产生学生的互动,提高沟通。他们喜欢一起创作。评估结果预计除了传统的讲座之外,基于团队的工作研究方法可以增强对项目交付方法的理解;学生们有机会在团队环境中工作,通过合作学习,并培养领导技能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号