Cost Comparison of Collaborative and IPD-like Project Delivery Methods Versus Competitive Non-collaborative Project Delivery Methods

机译:协作和类似于IPD的项目交付方法与竞争性非协作项目交付方法的成本比较

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Collaborative project delivery methods are believed to contribute to faster completions times, lower overall project costs and higher quality. Contracts are expected to influence the degree of collaboration on a given project since they allow or restrict certain lines of communication in the decision making process. Various delivery systems rank differently on the spectrum of collaboration. Because collaborative project delivery methods require owners and AEC stakeholders to meet frequently early in the delivery process, they are thought to add additional upfront costs to the project. The purpose of this study is to test if collaborative project delivery methods impart enough value so that the upfront cost incurred at the beginning of project is eventually surpassed by realized savings. Ideally, the extreme forms of project delivery methods, that is, Integrated Project Delivery (IPD) and Design-Bid-Build (DBB), should be compared to test the effects of collaboration on benefits to the owner. Due to difficulty in obtaining data on IPD and similarly scaled DBB projects, for this study, their close cousins, CM-at-Risk (CMR) and Competitive Sealed Proposal (CSP) were compared.The study engaged statistical comparison of cost of change orders and overall project cost performance of 17 CMR and 13 CSP projects of similar scales by same owner. Project cost performance observed under CMR projects was found significantly more than those under CSP. This study is expected to help boost confidence in the benefits of collaborative project delivery methods. It is likely that the results will encourage acceptance of IPD for public projects. Owners who were previously discouraged by the increased upfront cost of collaborative projects may also find interest in the results of this study.
机译:协作项目交付方法被认为有助于加快完成时间,降低总体项目成本和提高质量。由于合同允许或限制决策过程中的某些沟通渠道,因此合同有望影响给定项目的协作程度。各种交付系统在协作范围上的排名不同。由于协作项目交付方法要求所有者和AEC利益相关者在交付过程中尽早开会,因此他们被认为会增加项目的前期成本。这项研究的目的是测试协作项目交付方法是否赋予了足够的价值,从而使项目开始时产生的前期成本最终被所实现的节省所抵消。理想情况下,应该比较极端形式的项目交付方法,即集成项目交付(IPD)和设计投标构建(DBB),以测试协作对所有者利益的影响。由于难以获得IPD和类似规模的DBB项目的数据,因此对本研究的近亲,风险管理CM(CMR)和竞争密封提案(CSP)进行了比较。该研究进行了变更单成本的统计比较同一所有者的17个CMR项目和13个CSP项目的总体项目成本绩效。发现在CMR项目下观察到的项目成本绩效比在CSP下显着更多。预期该研究将有助于增强对协作项目交付方法的好处的信心。结果很可能会鼓励公共项目接受IPD。先前因协作项目的前期成本增加而灰心的业主也可能会对这项研究的结果产生兴趣。

著录项

  • 作者

    Kulkarni Aditi;

  • 作者单位
  • 年度 2012
  • 总页数
  • 原文格式 PDF
  • 正文语种 en_US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号