首页> 外文会议>UEF and NaBRO international conference on high performance materials in bridges and buildings >Experimental Studies of Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs
【24h】

Experimental Studies of Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs

机译:瓦楞钢网预应力混凝土箱梁桥的实验研究

获取原文

摘要

This paper presents results of tests on eight scaled prestressed concrete box-girder bridges with corrugated steel webs. All eight specimens were divided into two groups according to the thickness of the top and bottom slabs. In the first group, the primary experimental parameter is the effective prestress, ranging from 0.3 to 0.8 of the yield stress of prestressing strands. In the second group, the location of prestressing strands at both ends of the specimens and the thickness of end diaphragms are the two major parameters. Based on the experimental results of all eight specimens, their cyclic behavior is critically examined, including ductility factor, and failure mode,etc. It was found that the failure mode depended on the thickness of the top and bottom slabs; larger effective prestressing resulted in earlier occurrence of concrete crushing in the bottom slab close to the end diaphragm; and both the thickness of end diaphragms and the location of prestressing strands at both ends of the specimens are insignificant when the specimens failed at the mid-span due to concrete crushing.
机译:本文介绍了八个缩放预应力混凝土箱梁桥梁的试验结果,瓦楞钢网。根据顶部和底板的厚度分为两组,所有八个标本都分为两组。在第一组中,主要实验参数是有效的预应力,范围为预应力链的屈服应力的0.3至0.8。在第二组中,试样的两端的预应力链的位置和端膜的厚度是两个主要参数。基于所有八个标本的实验结果,它们的循环行为是批判性检查的,包括延展性因子和失效模式等。发现故障模式取决于顶部和底板的厚度;较大的有效预应力导致底部板坯近端的混凝土发生较近的混凝土;当标本在中间跨度导致的混凝土压碎时,末端隔膜的厚度和预应力链的厚度和预应力链的位置是微不足道的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号