首页> 外文会议>North American Tunneling Conference >Pushing the Limit-Shallow Cover Slurry TBM Mining Between Active Commuter Rail Tracks
【24h】

Pushing the Limit-Shallow Cover Slurry TBM Mining Between Active Commuter Rail Tracks

机译:推动有源通勤轨道轨道之间的极限浅盖浆料TBM挖掘

获取原文

摘要

Slurry TBM evolution has allowed for increased control of face pressure and ground stability which correlates to increased success for shallow cover mining. This was a necessary component of the B/C Tunnel Extension performed in Queens, NY for the East Side Access Project. Through a coordinated effort, the designer, contractor, and construction management teams pushed a 6.86m (22'-6") diameter Herrenknecht slurry TBM beyond contract expectations, culminating in less than 1/2 shield diameter of cover. This paper explores the operation strategy with details regarding the surface and underground coordination, instrumentation plan, and program wide cost and schedule savings associated with its success.
机译:浆料TBM进化允许增加面部压力和地面稳定性的控制,这与浅覆盖采矿的成功增加相关。这是在QUEENS,NY为东侧访问项目中执行的B / C隧道扩展的必要组成部分。通过协调的努力,设计师,承包商和建筑管理团队推动了6.86亿(22'-6“)直径的海参TBM,超越合同期望,最终在不到1/2盾直径的盖子上。本文探讨了操作关于表面和地下协调,仪器仪表计划和计划广泛成本的策略,并将节省与其成功相关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号