Lined Concrete Segments: An Alternative Construction Method for a Large Diameter Sewer Tunnel

机译:衬砌的混凝土段:大直径下水道隧道的替代施工方法

获取原文

摘要

The Upper Northwest Interceptor 1&2 Tunnel (UNWI 1&2) is currently under construction by Sacramento Regional County Sanitation District (SRCSD). This 144-inch inside diameter wastewater tunnel is being constructed in soft ground below the groundwater table using an earth pressure balance tunneling machine. The tunnel is supported with precast concrete segments lined with PVC. This is the first use of precast PVC lined concrete segments to construct a sewer tunnel in the United States. In the past, large diameter sewer tunnels have typically been constructed using pipe jacking, a two pass system, or by adding a liner after construction. Using PVC lined concrete segments to construct sewer runnels offers the industry an alternative approach.
机译:萨克拉门托区域县卫生区(SRCSD)目前正在建设中位于西北拦截1和2隧道(Unwi 1&2)。该144英寸内径的废水隧道采用地下压平衡隧道机在地下水位下方的软土地板中构造。隧道支撑有带有PVC的预制混凝土段。这是第一次使用预制PVC衬里混凝土段,在美国建造下水道隧道。在过去,通常使用管壁,两个通过系统或在构造之后添加衬里来构造大直径下水道隧道。使用PVC衬里的混凝土段构造下水道润轮提供行业的替代方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号