首页> 外文期刊>Structural concrete >Design procedure for precast fibre-reinforced concrete segments in tunnel lining construction
【24h】

Design procedure for precast fibre-reinforced concrete segments in tunnel lining construction

机译:隧道衬砌施工中纤维混凝土预制件的设计程序

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a procedure for designing precast tunnel segments for mechanically excavated tunnel linings in fibre-reinforced concrete, without any traditional steel reinforcement. Both ultimate and serviceability limit states are considered as well as structural checks at different construction stages of the segment, including demoulding, positioning on floor, storage, transportation, handling and the final stage concerning the loads due to the ground pressure.
机译:本文提出了一种在没有任何传统钢筋的情况下,为纤维增强混凝土中的机械开挖隧道衬砌设计预制隧道段的程序。在该段的不同施工阶段都考虑了极限状态和可使用性极限状态,以及结构检查,包括脱模,在地板上定位,存储,运输,搬运以及与地面压力有关的最终阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号