首页> 外文会议>International Nuclear Physics Conference >The status of new fragment separator ACCULINNA-2 project and the first day experiments
【24h】

The status of new fragment separator ACCULINNA-2 project and the first day experiments

机译:新碎片分离器归甲酮的状态和第一天实验

获取原文

摘要

The new facility fragment separator ACCULINNA-2 will be put into operation at the beginning of 2015 in FLNR JINR. The new separator is destined to add considerably to the studies of drip-line nuclei performed with the use of variety of direct reactions known to be distinctive to the 15- 50 MeV/amu exotic secondary RIBs Intense beams provided by the U-400M cyclotron will ensure the achievement of this objective In addition to the RIB separation accomplished by means of the dipole-wedge-dipole selection, the addition of a zero-degree dipole magnet setup is foreseen. A long (13 m) straight section will provide precise time-of-flight measurements.
机译:新的设施片段分离器Acculinna-2将于2015年初在Flnr Jinr投入运营。新的分离器注定要大大加入滴水线核的研究,该研究通过使用各种直接反应表现出与U-400M回旋加速器提供的15-50MeV / Amu异种二级肋骨强烈的梁的鲜明束除了通过偶极楔子偶极选择完成的肋条分离之外,还要确保实现该目的的实现,预先添加零度偶极磁铁设置。长(13米)的直线部分将提供精确的飞行时间测量。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号