首页> 外文会议>International symposium on modern tunneling science and technology >Stability Settlement due to Bored Tunnelling for Singapore LTA
【24h】

Stability Settlement due to Bored Tunnelling for Singapore LTA

机译:由于新加坡LTA的钻孔隧道稳定与沉降

获取原文

摘要

Ground response to Earth Pressure Balance Shield Tunnelling has been measured and investigated for the twin bored tunnels of the contract C705 of Singapore MRT, North East Line. At depth the geology comprised Old Alluvium overlain by soft deposits of the Kallang Formation. Detailed measurements at the ground surface show the response of the ground as the tunnel face passed. This paper investigates the relationship between face pressure, stability and volume loss for the different soil types encountered. The stability of the tunnel face and related surface settlements were found to be consistent with estimates from simple predictive techniques.
机译:对地球压力平衡屏蔽隧道的地面响应已经测量和调查了新加坡地铁,东北线合同C705的双钻孔隧道。深度地质构成了通过Kallang地层的软沉积物构成了旧的沉重覆盖物。当隧道面通过时,地面的详细测量显示了地面的响应。本文研究了遇到的不同土壤类型的面压力,稳定性和体积损失之间的关系。发现隧道面和相关表面沉降的稳定性与简单预测技术的估计一致。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号