首页> 外文OA文献 >Monitoring and Analysis of Ground Settlement Induced by Tunnelling with Slurry Pressure-Balanced Tunnel Boring Machine
【2h】

Monitoring and Analysis of Ground Settlement Induced by Tunnelling with Slurry Pressure-Balanced Tunnel Boring Machine

机译:钢筋混凝土平衡隧道镗床隧道沟壑区诱导地面沉降监测与分析

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

A case study of monitoring and analysis of ground settlement caused by tunnelling of stacked twin tunnels for underground metro line construction through the densely populated area using the slurry pressure-balanced TBM is presented. Detailed ground settlement monitoring was carried out for the initial stage of down-track tunnelling in order to estimate trough width factor and volume losses including face, shield, and tail losses. In addition, using the gap model, prediction of volume loss and ground settlement was carried out with consideration of the ground condition, TBM configurations, and actual operation data. The predictions of the gap model were compared with the observed results, and adjustment factors were determined for volume loss estimation. The adjusted factors were applied to predict ground settlement of the up-track tunnel, and its results were compared with the field measurements.
机译:展示了通过使用浆料压力平衡TBM浓密填充地区堆积地铁隧道隧道隧道隧道隧道隧道隧道监测分析的案例研究。对下轨道隧道初始阶段进行了详细的地面沉降监测,以估计槽宽度因数和体积损耗,包括面部,屏蔽和尾部损失。另外,使用间隙模型,考虑到地下条件,TBM配置和实际操作数据进行体积损耗和地沉降的预测。将间隙模型的预测与观察结果进行了比较,测定调节因子进行体积损失估计。调整后的因子被应用于预测上轨道隧道的地面沉降,并将其结果与现场测量进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号