首页> 外文会议>Randol gold silver forum >COST SAVING INITIATIVES - BODDINGTON GOLD MINE
【24h】

COST SAVING INITIATIVES - BODDINGTON GOLD MINE

机译:节省成本节省举措 - Boddington金矿

获取原文

摘要

BGM commenced operations with grades in the mid 3 g/t range and is approaching the completion of operations at grades about 0.8 g/t, grades which were dispatched to low grade dumps at the commencement of operation. It is expected the present mining operation will cease in the last quarter of 2001, the end of a gold mine in which its people responded to the challenge of a falling gold price and diminishing ore supply.
机译:BGM在3 G / T中期的级别开始使用等级的行动,并在运营开始期间接近0.8克/ T的等级的级别完成,这些级别被派遣到低级垃圾级。预计目前的采矿业务将于2001年的上季度停止,这是一个金矿的结束,其中人民对黄金价格下跌和矿石供应减少的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号