首页> 外文期刊>Mining Engineering >Boddington gold mine's expansion project includes overland conveyor
【24h】

Boddington gold mine's expansion project includes overland conveyor

机译:博丁顿金矿的扩建项目包括陆上输送机

获取原文
获取原文并翻译 | 示例
           

摘要

Since the most significant component of the conveyor power and tension calculations was the force required to lift the material from the loading point to the discharge pulley, the extra seal drag did not appreciably affect the overall power and tensions. Since the winch was directly connected to the active working cable, the winch safety factor had to include the dynamic tensions that could be realized in the cable.
机译:由于输送机功率和张力计算中最重要的部分是将物料从装载点提升到出料皮带轮所需的力,因此额外的密封阻力不会明显影响总功率和张力。由于绞盘直接连接到活动的工作电缆,因此绞盘安全系数必须包括可在电缆中实现的动态张力。

著录项

  • 来源
    《Mining Engineering》 |2010年第11期|p.47-51|共5页
  • 作者单位

    Todd Hollingsworth, and Tyler Harris, members SME, are mechanical engineering manager and project mechanical engineer with FLSmidth Conveyor Engineering Inc., Boise, ID, e-mail todd. hollingsworth@flsmidth.com, tyler.harris@flsmidth.com.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号