DESIRED VERSUS REALIZED BENEFITS OF ALTERNATIVE CONTRACTING METHODS ON EXTREME VALUE HIGHWAY PROJECTS

机译:期望与极值高速公路项目的替代收缩方法的实现优势

获取原文

摘要

Highway agencies choose alternative contracting methods (ACMs) to for a wide variety of reasons, primarily their potential for superior cost and schedule performance. Most literature focuses on these two factors by analyzing aggregate datasets covering a wide-ranging contract values. These analyses create two voids that this paper attempts to explore: (1) ACMs provide a wide variety of benefits, which cost and schedule performance alone do not identify; and (2) projects of differing contract values benefit differently. This paper investigates the selection criteria for ACMs and why US agencies chose ACMs for projects at the extreme ends of the cost spectrum (defined as projects at the upper and lower 10th percentiles for each delivery method) and what benefits are realized, above and beyond cost and schedule performance. These findings are presented through a survey of 291 US projects, interviews of sixteen US agency representatives, literature review, agency ACM manual content analysis.
机译:高速公路机构选择替代合同方法(ACMS),以获取各种原因,主要是它们越来越优越的成本和日程绩效。大多数文献通过分析涵盖宽范围的合同值的集合数据集来侧重于这两个因素。这些分析创建了两个空白,本文试图探索:(1)ACMS提供了各种各样的福利,即单独的成本和安排性能不识别; (2)不同合同价值的项目有所不同。本文调查了ACMS的选择标准以及为什么美国机构在成本频谱的最终结束时选择ACMS(定义为每个送货方式的上下10个百分位数的项目),并且实现了哪些益处,以上和超出成本并安排绩效。这些调查结果是通过对291个美国项目的调查提出的,六十六个美国代理代表,文献综述,机构ACM手册内容分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号