首页> 外文期刊>Journal of Infrastructure Systems >Performance Analysis of Alternative Contracting Methods for Highway Construction Projects: Case Study for Iran
【24h】

Performance Analysis of Alternative Contracting Methods for Highway Construction Projects: Case Study for Iran

机译:公路建设项目替代承包方法的性能分析:伊朗案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

The suitability of the project delivery system (PDS) selected for a project greatly influences the efficiency of project implementation. In Iran, traditional design-bid-build (DBB) is commonly used for highway construction projects; however, DBB leads to problems such as cost overruns, delays, and poor quality. This study aims to compare the performance of DBB with that of alternative contracting methods (ACM), including design-build (DB) and construction manager (CM) methods, for highway projects in Iran. A survey was conducted to determine the most important decision-making criteria for selecting the appropriate PDS to use in highway projects. The survey, conducted by postal questionnaire, aimed to empirically validate the reliability of the model. In the survey, all the conditions for imposing the effective criteria were considered, and ultimately a model using the analytical hierarchy process (AHP) was developed to rank the PDSs for highway construction projects in Iran. The results showed that DB is most often the optimal method. The research can be used to prepare a model that can help project owners make sound decisions about the best PDS.
机译:为项目选择的项目交付系统(PDS)的适用性极大地影响了项目实施的效率。在伊朗,传统的设计出价(DBB)通常用于公路建设项目;但是,DBB导致成本超支,延迟和质量差等问题。本研究旨在将DBB的性能与伊朗的高速公路项目进行了替代契约方法(ACM),包括设计 - 构建(DB)和建筑经理(CM)方法。进行了一项调查,以确定选择适当的PDS在公路项目中使用的最重要的决策标准。邮政调查问卷进行的调查旨在经验验证模型的可靠性。在该调查中,考虑了施加有效标准的所有条件,并最终开发了使用分析层次过程(AHP)的模型,以对伊朗进行公路建设项目的PDS。结果表明,DB最常是最佳方法。该研究可用于准备一个模型,可以帮助项目业主对最佳PDS做出声音决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号