首页> 外文会议>International Structural Engineering and Construction Conference >IMPROVING PRODUCTIVITY, WORKFLOW MANAGEMENT, AND RESOURCE UTILIZATION IN PRECAST CONSTRUCTION
【24h】

IMPROVING PRODUCTIVITY, WORKFLOW MANAGEMENT, AND RESOURCE UTILIZATION IN PRECAST CONSTRUCTION

机译:提高预制结构的生产力,工作流管理和资源利用

获取原文

摘要

Construction industry has long dealt with problems such as low productivity, unstable workflow in projects and low utilization rate of resources. Off-site construction, which is a hybrid of mass manufacturing and construction, has significant potential to address aforementioned problems. In order to realize this potential, off-site construction needs to avoid replicating the traditional subcontracting approach and therefore fragmented practice in the construction industry. The current research focuses on restructuring the interaction of resources by using cross-training. Findings show that cross-training resources results in transferring excess capacity from underutilized to over utilized resources in direct or indirect pathways. Such initiatives can significantly improve productivity, workflow management and resource utilization in precast construction that highly specialized resources are not required. The study contributes to the construction management literature by providing insight into dynamics of using multi-skilled resources in off-site construction.
机译:建筑业长期以来涉及低生产率,项目的不稳定工作流程等问题,以及资源利用率低。非现场建设,即大规模制造和施工的混合,具有解决上述问题的巨大潜力。为了实现这一潜力,场外施工需要避免复制传统的分包方法,因此在建筑行业进行分散的实践。目前的研究侧重于使用交叉训练重组资源的互动。调查结果表明,交叉训练资源导致将过剩的产能转移到直接或间接途径中的过度利用资源。这些举措可以显着提高生产率,工作流管理和资源利用在预制结构中,不需要高度专业化的资源。该研究通过在非现场建设中提供了利用多技术资源的动态,有助于建设管理文献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号