DESIGN-BUILD OF WATERTIGHT UNDERGROUND STRUCTURES FOR TUNNELING IN MIAMI, FLORIDA - THE NORRIS CUT UTILITY RELOCATION PROJECT

机译:佛罗里达州迈阿密隧道隧道隧道地下结构的设计 - 诺里斯削减实用程序搬迁项目

获取原文

摘要

In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for MiamiDade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force mainthat runs from the Virginia Key Central District Wastewater Treatment Plant, under the Biscayne Bay atNorris Cut, to Fisher Island. In order to install the new sewer pipe below the bottom of Biscayne Bay, atunnel boring machine (TBM) was launched from a 42ft diameter and 89ft deep shaft on Virginia Key anda precast segmentally lined tunnel was constructed towards a 28ft diameter and 72ft deep retrieval shaft onFisher Island.Both shafts were constructed through sand and highly permeable limestone, primarily the Fort ThompsonFormation which is part of one of the most permeable aquifers in the United States and two differenttechniques were used to ensure a water-tight shaft at each end of the tunnel drive. The launch shaft structurewas built using the secant pile technique, wet excavation and a tremie plug. For the tunnel break-in a soilfreeze block was installed after the ground was treated with low mobility grout. The retrieval shaft was builtusing the Deep Soil Mixing (DSM) technique and excavated in the dry. Precedence of any other structurebuilt this deep through hard layers (UCS over 3,000 psi) using this technique was not found.This case study addresses the challenges of constructing watertight underground structures in highly porousground for launching and retrieving a TBM. Design challenges from complex asymmetric loading, selectionand comparison of the construction techniques, the installation and excavation of both shafts, and theirperformance are also discussed herein.
机译:2017年,尼科尔森建筑公司为迈阿密完成了7210万美元的设计 - 建造合同戴德水和下水道部门取代现有54英寸直径的预应力混凝土力从弗吉尼亚重点中央区污水处理厂运行,在比斯坎湾下诺里斯削减了Fisher岛。为了在Biscayne Bay底部安装新的下水道管道,隧道镗床(TBM)由42英尺直径和89英尺的深轴发射,弗吉尼亚键和预制分段衬里隧道朝向28英尺直径和72英尺深的检索轴构造费舍尔岛。两个轴通过沙子和高度渗透性石灰岩构建,主要是汤普森形成是美国最渗透含水层之一的一部分,两种不同使用技术用于确保隧道驱动器的每一端处的水紧轴。发射轴结构是使用剪辑桩技术,湿挖掘和TREMIE插头建造的。对于隧道破碎土壤在用低移动灌浆处理地面后安装了冻结块。检索轴是建造的使用深土混合(DSM)技术并在干燥中挖掘。任何其他结构的优先级找不到使用这种技术的硬层(UCS超过3,000psi)深度建立。本案研究解决了在高度多孔中构建水密地下结构的挑战地面推出和检索TBM。从复杂的不对称加载,选择的设计挑战并比较轴的施工技术,安装和挖掘及其挖掘本文还讨论了性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号