The North Strathfield Rail Underpass -Driven Tunnel Design and Construction

机译:北斯特拉斯菲尔德铁路地下通道 - 驱动的隧道设计和施工

获取原文

摘要

The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide, with a horseshoe profile, excavated by full face using a road header. Ground cover varied between 2.5 m to 3.5 m. Settlements were 5 mm to 15 mm (the latter due to a dyke). A one pass synthetic fibre reinforced shotcrete lining was installed (no lattice girders or steel sets were used). A system of automated robotic total stations was used to provide real time monitoring of the rail track and associated ground formation. No disruption to train services occurred.
机译:单轨North Strathfield Rail地下通道(NSRU)包括一个潜水结构,任一端的148米长的隧道围绕着三个现场铁路轨道偏斜。隧道高8米高,9米宽,具有马蹄形型材,通过使用道路标头的全面挖掘出来。地面盖板在2.5米至3.5米之间变化。定居点为5毫米至15毫米(后者由于堤坝)。安装了一种通过合成纤维增强喷射衬里(没有使用晶格梁或钢结构)。自动机器人总站系统用于提供对轨道轨道和相关地面形成的实时监测。没有发生培训服务的干扰。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号