首页> 外文会议>Congress of the IABSE >The impossible becomes possible - an infrastructure project
【24h】

The impossible becomes possible - an infrastructure project

机译:不可能成为可能 - 一个基础设施项目

获取原文

摘要

To counteract the high volume of traffic in the historical city of Karlsruhe, Germany, the rail infrastructure of the above-ground tracks is being moved underground while maintaining full pedestrian, road and tram operation. To this end, seven underground stations will be built in the cut-and-cover / dig-and-cast design, and subsequently connected by a tunnel boring machine (TBM) before excavation. After the preparation of the tunnel, the underground stations shall be excavated via the newly established tunnel tube. The concrete construction of the stations will then be a waterproof construction. The challenge of this downtown project is designing the construction for the handling of the historical buildings in relation to settling and in the construction logistics, involving the step-bystep manufacture of the covers while keeping the traffic above ground running.
机译:为了抵消德国卡尔斯鲁厄市历史城市的大量交通,上面地面轨道的铁路基础设施正在搬到地下,同时保持完整的行人,道路和电车操作。为此,七个地下站将内置在切割和挖掘/挖掘机设计中,随后在挖掘前通过隧道镗床(TBM)连接。在隧道制备后,将通过新建立的隧道管挖掘地下站。然后,车站的混凝土结构将是防水结构。该市中心项目的挑战正在设计与建筑和建筑物流相关的历史建筑物的建设,涉及封面的逐步制造,同时保持地面运行的交通。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号