首页> 外文会议>Middle East Oil Gas Show and Conference >Mesophase Technology for Wellbore Cleanouts–Case History
【24h】

Mesophase Technology for Wellbore Cleanouts–Case History

机译:用于蜂拥而至的中间相技术 - 案例历史

获取原文
获取外文期刊封面目录资料

摘要

This paper is a case history of two successful applications of mesophase technology for wellbore cleanouts and flow back enhancement. The first application was as a remedial treatment after the well’s ESP pumped off and the second application was part of the completion process. Both wells were completed as open-hole horizontal wells, one with expandable sand screens (ESS) and the other with stand alone mesh type premium screens (SAS). Wells in this field are typically drilled with 65 pcf invert oil emulsion drill-in fluid (DIF) and can be as much as 800 psi over balance to formation pressure. The DIF is intuitively managed with respect to mud solids control, so there is no actual QA/QC on the solids management. The ESS completion was treated remedially with coiled tubing (CT) and rotating jet blasters months after the completion. The horizontal well was accessed through a Y-tool bypass that was part of the ESP completion. The SAS completion was treated with CT and rotating jet blasters after running the screen and setting the packer; prior to running the ESP completion, due to casing size limitations for running a Y-tool bypass.
机译:本文是一种案例历史历史,其两种成功应用Mesophase技术在井筒清洁和流回来增强。第一个申请是在井的ESP关闭后作为补救治疗,第二个应用程序是完成过程的一部分。两个井都被完成为露天水平孔,一个带有可扩展的砂屏(ESS),另一个具有独立网格类型优质屏幕(SAS)。该领域的井通常用65pCF反转油乳液钻井液(DIF)钻孔,并且可以在平衡到形成压力,并且可以高达800psi。对于泥浆固体控制直观地,DIF直观地管理,因此在固体管理中没有实际的QA / QC。在完成后的卷绕管(CT)和旋转喷射器爆破剂的情况下,对ESS完成进行了处理。通过Y-Tool Bypass访问水平井,即ESP完成的一部分。在运行屏幕并设定包装器后,用CT和旋转喷射器爆破处理SAS完成;在运行ESP完成之前,由于套件尺寸限制,用于运行Y工具旁路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号