首页> 外文会议>Annual Conference of Metallurgists >THE IMPACT OF OPERATING COST ON LIFE-OF-MINE COSTS OF HYDROMETALLURGY FACILITIES
【24h】

THE IMPACT OF OPERATING COST ON LIFE-OF-MINE COSTS OF HYDROMETALLURGY FACILITIES

机译:运营成本对湿法冶金设施矿井成本的影响

获取原文

摘要

A significant effort is expended on preparation of the capital estimate for feasibility studies. The development of the operating cost estimate is usually allocated a significantly smaller budget and less emphasis is placed on ensuring the accuracy of the operating cost. This paper presents a comparison of capital and operating costs of hydrometallurgy processing plants in order to demonstrate the importance that variations in operating costs have on the overall life-of-mine costs. The analysis is supported by a case study on the operating costs of a water treatment plant at an existing Australian hydrometallurgy facility at the feasibility design level.
机译:在制定可行性研究的资本估计的准备方面消除了重大努力。经营成本估算的发展通常分配明显较小的预算,并更加重点放置在确保运营成本的准确性上。本文介绍了湿法冶金加工厂的资本和运营成本的比较,以证明运营成本变化对整体矿山成本的重要性。通过在可行性设计水平的现有澳大利亚湿法冶金设施中的水处理厂的运营成本来支持分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号