首页> 外文会议>IEEE Particle Accelerator Conference >CYCLE-TO-CYCLE EXTRACTION SYNCHRONIZATION OF THE FERMILAB BOOSTER FOR MULTIPLE BATCH INJECTION TO THE MAIN INJECTOR
【24h】

CYCLE-TO-CYCLE EXTRACTION SYNCHRONIZATION OF THE FERMILAB BOOSTER FOR MULTIPLE BATCH INJECTION TO THE MAIN INJECTOR

机译:用于多个批量喷射到主喷射器的Fermilab Booster的循环到周期提取同步

获取原文

摘要

We report on a system to ensure cycle-to-cycle synchronization of beam extraction from the Fermilab Booster accelerator to the Main Injector. Such synchronization is necessary for multiple batch operation of the Main Injector for the Run II upgrade of anti-proton production using slip-stacking in the Main Injector, and for the NuMI (Neutrinos at the Main Injector) neutrino beam. To perform this task a system of fast measurements and feedback controls the longitudinal progress of the Booster beam throughout its acceleration period by manipulation of the transverse position maintained by the LLRF (Low-level Radio Frequency) system.
机译:我们报告了一个系统,以确保从Fermilab升压加速器到主喷射器的束射线循环与梁提取的周期同步。使用在主喷射器中使用滑动堆叠的运行II升级的抗质子生产的主要喷射器的多个批量操作是必要的,并且用于使用主喷射器,以及用于Numi(主喷射器处的NemarinoS)中子束的Numi(中微子)。为了执行该任务,快速测量系统和反馈系统通过操纵由LLRF(低电平射频)系统维护的横向位置来控制升压光束整个加速度的纵向进展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号