首页> 美国政府科技报告 >Cycle-To-Cycle Extraction Synchronization of the Fermilab Booster for Multiple Batch Injection to the Main Injector
【24h】

Cycle-To-Cycle Extraction Synchronization of the Fermilab Booster for Multiple Batch Injection to the Main Injector

机译:用于多批次注入的费米实验室增压器的循环到循环提取同步到主喷射器

获取原文

摘要

We report on a system to ensure cycle-to-cycle synchronization of beam extraction from the Fermilab Booster accelerator to the Main Injector. Such synchronization is necessary for multiple batch operation of the Main Injector for the Run II upgrade of anti-proton production using slip-stacking in the Main Injector, and for the NuMI (Neutrinos at the Main Injector) neutrino beam. To perform this task a system of fast measurements and feedback controls the longitudinal progress of the Booster beam throughout its acceleration period by manipulation of the transverse position maintained by the LLRF (Low-level Radio Frequency) system.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号