【24h】

A SIMULATION MODEL FOR MINE PRODUCTION SEQUENCES

机译:矿山生产序列的仿真模型

获取原文
获取外文期刊封面目录资料

摘要

Mine design process strictly dependent on the economical variables of the orebody and the rock mass properties having effect on the physical parameters of the intended mining system. In addition, the dynamic aspects of the possible system must be taken into account. Difficulty in design arises mainly from the difficulty in obtaining enough and reliable data. Collecting enough and quality data requires to costly and timely procedures. Therefore, the mine design engineers have to consider alternative cases in their designs or they have to design with limited data. This study presents a simulation model that can be used to develop the production subsystem model of an underground mining system. A mechanized production system model and a decision analysis tool using a discrete event simulation process were developed. The tool allows an engineer with experimenting his/her design to generate a model that can meet the targeted production rate.
机译:矿井设计过程严格依赖于矿体和岩石质量特性的经济变量对预期采矿系统的物理参数影响。此外,必须考虑可能系统的动态方面。设计中的难度主要来自获得足够且可靠的数据的困难。收集足够的和质量数据需要昂贵和及时的程序。因此,矿山设计工程师必须考虑其设计中的替代情况,或者他们必须使用有限的数据设计。本研究提出了一种模拟模型,可用于开发地下采矿系统的生产子系统模型。开发了一种机械化生产系统模型和使用离散事件仿真过程的决策分析工具。该工具允许工程师试验他/她的设计来生成可以满足目标生产率的模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号