首页> 外文会议>IFAC Workshop on Discrete Event Systems >Scheduling and Control of Start-up Process for Time-Constrained Single-Arm Cluster Tools with Parallel Chambers
【24h】

Scheduling and Control of Start-up Process for Time-Constrained Single-Arm Cluster Tools with Parallel Chambers

机译:与并联室的时间约束单臂簇工具的启动过程调度和控制

获取原文

摘要

In wafer manufacturing, with the shrinking down of wafer lot size, cluster tools are frequently required to switch from handling one lot of wafers to another, resulting in more transient processes, including start-up and close-down processes. In the existing work, optimal scheduling of start-up process for time-constrained single-arm cluster tools has been addressed under the assumption that each processing step consists of just one process chamber. This work relaxes this strict restriction by treating that multiple process chambers could be configured for processing steps. By building Petri net model for the start-up process, a linear program is derived to search a feasible schedule with minimal makespan for time-constrained single-arm cluster tools with parallel chambers for the first time. One industrial example is given to demonstrate the effectiveness of the obtained results.
机译:在晶片制造中,随着晶片批量缩小的缩小,经常需要群集工具来将一批晶片切换到另一个晶片,导致更多的瞬态过程,包括启动和关闭过程。在现有的工作中,在每个处理步骤包括一个处理室的假设,已经解决了用于时间约束单臂集群工具的最佳调度。通过处理可以配置多个处理室来处理步骤来放松这种严格的限制。通过为启动过程构建Petri净模型,导出了一个线性程序,以便在第一次使用Minimant的单臂集群工具的最小MakeSpan以及第一次使用并联腔室的可行计划。给出一个工业例子证明了所得结果的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号