【24h】

COTS Acquisition: Getting a Good Contract

机译:婴儿床习得:获得良好的合同

获取原文

摘要

Organizations that are acquiring a COTS based system must adapt many of their acquisition process activities that are traditionally used for acquiring non-COTS based systems. Much of this adaptation becomes quite difficult within government environments where the process is often constrained by government rules and regulations. This paper provides an experience report on COTS based acquisition for a government agency during the early stages of the process. The impact on requirements engineering and the steps for developing the Request For Proposal (RFP) and evaluating the proposals are outlined. The parties involved in the acquisition process are identified, and their relationship within a project governance structure are discussed. The final discussion provides some guidance as to how the early stages of the acquisition process should be adapted to minimize risk through the project.
机译:获取基于COTS的系统的组织必须适应其传统上用于获取基于非COTS的系统的许多采集过程活动。在政府环境中,大部分这种适应变得非常困难,该过程通常受到政府规则和法规的限制。本文在进程的早期阶段期间提供了关于政府机构的基于COTS获取的经验报告。概述了对需求工程的影响及提出提案请求(RFP)和评估提案的步骤。讨论了收购过程中涉及的各方,并讨论了项目治理结构内的关系。最终讨论提供了一些指导,以及如何适应采集过程的早期阶段,以最大限度地通过项目最大限度地降低风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号