Construction of Two Road Underpasses at Ma On Shan, Hong Kong SAR

机译:香港SAR山山马鞍山地下桥梁建设

获取原文

摘要

Two road underpasses each some 200m long, 16m wide and 12m high were constructed in tunnel during 2002-2003 to serve as slip roads as part of a new major trunk road (Road T7) in Ma On Shan, Hong Kong Special Administration Region. The tunnel excavation encountered weak, altered and metamorphosed sedimentary rock and strong granite rock. Power tools and drill & blast techniques were employed for the tunnel excavation. Due to the presence of heavily sheared stratified rocks and over extended lengths of the tunnel, the initial temporary support system adopted for the weak rock excavation comprised a combination of support canopy (forepoling), a lightweight steel set and fibrereinforced shotcrete. The initial temporary support design was re-assessed by numerical analysis (FLAC model) with a range of geological input parameters based on detailed face mapping and monitoring carried out during construction. This led to the subsequent omission of the invert strut of the steel set. The effects of blasting vibration on the closely spaced large span tunnels was monitored using seismographs and the results fed back into the design and procedures to optimise the production blasting. The vibration as detected at ground surface was monitored to be all within the allowable maximum peak particle velocity of 25mm/s. Permanent lining construction was facilitated with the use of movable lining shutters. The regular input from a specialist geotechnical advisor to the contractor helped improve the efficiency of the construction sequence and the excavation for the underpasses was completed one month ahead of programme.
机译:2002 - 2003年,隧道建造了两条道路底层,每年约200米长,16米宽12米高,作为滑动道路,作为香港特别行政区山山山马马的新主干道(道路T7)的一部分。隧道挖掘遇到弱,改变和变质的沉积岩和强花岗岩岩石。电动工具和钻孔和爆炸技术用于隧道挖掘。由于存在严重剪切的分层岩石和隧道的延长长度,用于弱岩石开挖采用的初始临时支撑系统包括支撑遮篷(前切割)的组合,轻质钢结构和纤维纤维的喷射。通过数值分析(FLAC模型)重新评估初始临时支持设计,其基于详细的面部映射和施工期间进行的监测进行了一系列地质输入参数。这导致了随后省略了钢结构的反转支柱。使用地震仪监测爆破振动对紧密间隔的大跨度隧道的影响,并将结果反馈到设计和程序中以优化生产爆破。监测如地面检测到的振动全部在允许的最大峰值粒子速度为25mm / s内。使用可移动衬里百叶窗促进了永久性衬砌结构。专家岩土技术顾问的经常意见对承包商有助于提高建筑序列的效率,并且在计划之前一个月内完成了地下通道的挖掘。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号