首页> 外文会议>Abu Dhabi International Petroleum Exhibition and Conference >Integrated Project Delivery(IPD):A paradigm shift for OilGas Giga Projects
【24h】

Integrated Project Delivery(IPD):A paradigm shift for OilGas Giga Projects

机译:综合项目交付(IPD):石油和天然气吉茄项目的范式转变

获取原文

摘要

The nearly$100 billion in megaprojects planned for Mozambique,for example,is more than 400 percent of the country’s total GDP,and the planned oil and gas investments in Papua New Guinea are 123 percent of GDP.Even in large,developed conomies,the size and scale of new oil and gas investments can represent a significant portion of the total economy.The combined value of Australia’s new oil and gas projects represents nearly 20 percent of the country’s$1.5 trillion GDP for 2012.The economic benefits to the country of getting the projects right are enormous(Deloitte,2013).
机译:例如,计划为莫桑比克计划的近1000亿美元的兆画幕,占该国总GDP的400%以上,巴布亚新几内亚的计划石油和天然气投资占GDP的123%。even在大型,发达的章程,大小新石油和天然气投资的规模可以代表一部分经济的重要部分。澳大利亚新石油和天然气项目的综合价值占该国2012年1.5万亿美元GDP的近20%。该国的经济利益项目权是巨大的(Deloitte,2013)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号