...
首页> 外文期刊>MATEC Web of Conferences >A critical perspective on Integrated Project Delivery (IPD) applied in a Norwegian public hospital project
【24h】

A critical perspective on Integrated Project Delivery (IPD) applied in a Norwegian public hospital project

机译:挪威公立医院项目中集成项目交付(IPD)的批判性观点

获取原文
           

摘要

Does the IPD concept deliver as required and expected, and if not, how can that be explained? This paper is a critical realist inspired methodology based on a combination of the inductive and deductive approaches used in case study research. IPD is based on relational contracting between multiple parties, in this case between the Owner, Contractor, MEP subcontractors and a group of Consulting engineers who share control of the project. At the core of the concept is shared risk and opportunities among the parties in the IPD contract. Our theoretical perspectives are based mainly on the Principal-Agent theory (PA), Transaction Cost theory (TC), and its related incentives. This paper reports on a study of the development of an existing public hospital that is constructing first a psychiatry and then a somatic building. The data collection in the paper is mainly in connection with the construction of the psychiatry building in 2018. Our findings show that IPD represents a game-changer in the behaviours and the organizing of AEC (Architect-Engineer-Construction) projects, ex-post IPD-contract. We identify examples of swapping occurring that require deep collaboration, which stems from changes in the commercial incentives. However, different individual incentives coupled with accompanying mindsets and opportunistic behaviour are still part of everyday life and are linked to people's past experiences, which can be understood as contextual conditions. In addition, the decision-making processes were not effective and characterized by revisiting previous decisions.
机译:IPD概念是否按要求和预期交付,否则,如何解释?本文是一种基于案例研究的归纳和演绎方法相结合的批判现实主义启发性方法。 IPD基于多方之间的关系合同,在这种情况下,是业主,承包商,MEP分包商和一组共享项目控制权的咨询工程师之间的关系。该概念的核心是IPD合同中各方之间共同承担的风险和机会。我们的理论观点主要基于委托代理理论(PA),交易成本理论(TC)及其相关激励因素。本文报告了对现有公立医院发展的研究,该公立医院首先要建设精神病学部门,然后再建设一个躯体建筑。本文中的数据收集主要与2018年的精神病学大楼的建设有关。我们的研究结果表明,IPD在行为和组织AEC(建筑师-工程师-建筑)项目的事后组织中起到了改变游戏规则的作用。 IPD合同。我们确定了发生交换的示例,这些示例需要深入的合作,而这种合作源于商业动机的变化。但是,不同的个人动机以及伴随的思维方式和机会主义行为仍然是日常生活的一部分,并且与人们过去的经历相关联,这可以理解为情境条件。此外,决策过程效率不高,其特征在于可以回顾以前的决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号