首页> 外文会议>International Yellow River Forum on River Basin Management >Preparation of the Bangladesh National Water Management Plan
【24h】

Preparation of the Bangladesh National Water Management Plan

机译:孟加拉国国家水管理计划的准备

获取原文

摘要

This paper describes the process used in preparing the Bangladesh National Water Management Plan. The paper begins with a recollection of the background to the planning exercise and summarises the brief given to the planners. It then describes the sequence of steps in the process, the adopted analytical approach, the structure of the Plan and presentation of the final documentation, which is supported by a purpose - built Management Information System and a National Water Resources Database. The paper concludes by offering some general conclusions for those who may undertake a similar process elsewhere in the future. The Plan was prepared as a rolling framework plan to implement the Government' s recently published National Water Policy. A highly participatory approach was adopted, involving widespread public consultation amongst a broad cross - section of water sector stakeholders. Many discussion documents were prepared in the lead up to agreement of the Development Strategy, from which the Plan itself was evolved. A comprehensive approach was assured through both sub - sectoral and regional assessment of issues and options, with multi - criteria analysis employed to determine components appropriate to the Plan. A suite of nested objectives link high - level Policy goals and NWMP objectives with sub - sectoral and programme aims, creating a framework for future monitoring and evaluation of Plan implementation. The Plan assigns responsibilities for implementation of its 84 cross - cutting, national and regional programmes and provides, through means of an Investment Portfolio, a framework for those responsible to prepare their own projects, confident that these projects will conform with Policy directives and development priorities.
机译:本文介绍了制定孟加拉国国家水管理计划的过程。本文首先回顾了计划锻炼的背景,并总结了给予规划者的简介。然后,它描述了该过程中的步骤顺序,采用的分析方法,计划的规划结构和最终文件的呈现,由目的建立的管理信息系统和国家水资源数据库支持。本文通过为这些可能在未来其他地方进行类似进程的人提供一些一般性结论。该计划被制定为劳动力框架计划,以落实政府最近出版的国家水资源政策。采用了一项高度参与性的方法,涉及广泛的水部门利益攸关方之间广泛的公众咨询。许多讨论文件在领导方面编写了发展战略的协议,计划本身正在进行中。通过对问题和选择的分解和区域评估来确保全面的方法,采用多标准分析,用于确定适合该计划的组件。一套嵌套的目标链接高级政策目标和国家部门和计划目标,创造了一个框架,以便进行计划实施的监测和评估。该计划为实施其84个跨领域,国家和区域方案的执行责任,并通过投资组合提供了一项负责制定自己的项目的人的框架,确信这些项目将符合政策指令和发展优先事项。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号