首页> 外文会议>IFAC World Congress >Aeration Control with Gain Scheduling in a Full-scale Wastewater Treatment Plant
【24h】

Aeration Control with Gain Scheduling in a Full-scale Wastewater Treatment Plant

机译:具有增益调度的曝气控制在全尺寸污水处理厂中的增益调度

获取原文

摘要

Process control is important at wastewater treatment plants to meet effluent criteria and minimise resource use. In a nitrogen removal plant, the aeration costs in the biological treatment part constitute the largest single electricity user at the plant. This study has investigated gain scheduling PI control at the Kappala wastewater treatment plant in full-scale operation and by simulation using a calibrated model of the plant. The aim was to vary the controller settings based on the nitrogen removal performance to achieve an energy saving. The best results were reached when scheduling the controller output limit, achieving a higher energy saving compared to a controller without gain scheduling.
机译:过程控制在废水处理厂是重要的,以满足污水标准并最大限度地减少资源使用。 在氮气去除植物中,生物处理部分中的曝气成本构成了该植物的最大单电用户。 该研究在全尺度操作中调查了Kappala废水处理厂的增益调度PI控制,并使用植物校准模型进行模拟。 目的是基于氮气去除性能来改变控制器设置,以实现节能。 在调度控制器输出限制时达到最佳结果,与没有增益调度的控制器相比,实现更高的节能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号