首页> 外文会议>Offshore Symposium >OFFSHORE WIND FARM DEVELOPMENT EMPLOYING SPECIALIZED MARINE TRANSPORTATION METHODS AND ADVANCED LIFTBOAT INSTALLATION SYSTEMS
【24h】

OFFSHORE WIND FARM DEVELOPMENT EMPLOYING SPECIALIZED MARINE TRANSPORTATION METHODS AND ADVANCED LIFTBOAT INSTALLATION SYSTEMS

机译:海上风电场开发采用专业的海运方式和先进的升水艇安装系统

获取原文

摘要

The development of an offshore wind facility is the topic of the paper to be presented. Electrical power is required in remote areas of the world. This paper describes the means and methods which are employed to provide a 10.5 MW offshore wind facility and the details of the marine offshore equipment necessary to transport, install and maintain the facility efficiently in remote areas. This paper will describe the wind farm which we are constructing for use in St. Thomas, US Virgin Islands. The future of wind power will be marine locations offshore the land situated to ensure that power can be produced near the usage point. This will allow for short power transmission lines and wind turbines located in offshore waters so that the land can be used for some commercial purposes. The paper outlines the construction of the wind farm being manufactured in south Louisiana and transported to St. Thomas, US Virgin Islands. The methods used to load-out and ship the equipment to the site, and the marine liftboat which will be employed for the installation and maintenance of the wind farm will be described. Due to the remote wind farm sites, the methods of installation will be "stand alone" and no assistance from the mainland will be required.
机译:海上风工厂的发展是要呈现的论文的主题。在世界的偏远地区需要电力。本文介绍了用于提供10.5兆瓦的海上风力设施以及在偏远地区有效地运输,安装和维护设施所需的船用海上设备的细节。本文将描述我们在美国维尔京群岛圣托马斯建造的风电场。风电的未来将是海上地区的土地,以确保在使用点附近产生电力。这将允许位于海上水域的短输电线和风力涡轮机,以便该土地可用于一些商业目的。本文概述了在路易斯安那州南路制造的风电场的建设,并运送到美国维尔京群岛圣托马斯。将描述用于装载和将设备装载和运送设备的方法,以及将用于安装和维护风电场的海洋升水艇。由于远程风电场网站,安装方法将是“独立”,需要大陆的援助。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号