The National Park Service (NPS) retained URS Corporation to assist in the rehabilitation design of St. Joseph Hall for future use as a joint administrative and visitor center. The building is historic, and is a three-story building with unreinforced brick bearing walls that is planned to be used for general assembly. For both of these reasons, the NPS judged that the rehabilitation design should meet a minimum life safety performance level for an earthquake with a 10% probability of exceedance in 50 years. This level was selected to balance the need to protect the historic fabric of the building with the seismic retrofit requirements. This life safety performance objective was achieved at a reasonable estimated construction cost, without affecting the historic fabric of the building, and meeting the evaluation and design requirements of the U.S. Federal Emergency Management Agency (FEMA) guidelines. The existing building was found to have two specific deficiencies, each of which would prevent the building from meeting the life safety performance level of the FEMA guidelines. The first deficiency is the lack of shear strength for the five brick piers located at the building's south side. The evaluation found that these piers would be overstressed for both rocking shear and in-plane shear by the design ground motion. Each brick pier would fail, resulting in a partial collapse of the main exit of the building. The second deficiency is the lack of adequate connections between the roof and floor diaphragms to the perimeter bearing shear walls. Due to the absence of adequate connections, the building would not act as a predictable "box type" structure, and its behavior following a large earthquake would be unpredictable, and could lead to the loss of the exterior walls. This paper traces the evaluation of the existing building and the development of several strengthening schemes, and finally discusses the proposed strengthening scheme with structural details.
机译:国家公园服务(NPS)保留了URS Corporation,协助康复设计圣约瑟夫大厅,以便将来作为联合行政和游客中心。该建筑是历史性的,是一个三层楼的建筑,拥有未合成的砖轴承墙,计划用于大会。对于这两种原因,NPS判断,康复设计应满足50岁的10%超出概率的地震最低生命安全性能水平。选择该级别以平衡建筑物历史面料的需要,以防地面改造要求。这种生命安全性能目标是以合理的估计建设成本实现的,而不影响建筑物的历史面料,并满足美国联邦应急管理机构(FEMA)指南的评估和设计要求。发现现有的建筑有两种特定的缺陷,每个缺陷都将阻止建筑物满足FEMA指南的生命安全性能水平。第一缺乏是位于大厦南侧的五砖码头缺乏剪切力量。评估发现,通过设计地面运动,这些码头将过度地用于摇摆剪切和面内剪切。每个砖码都会失败,导致建筑物的主要出口部分崩溃。第二缺陷是屋顶和地板隔膜之间缺乏足够的连接到周边轴承剪切壁。由于没有足够的联系,建筑物不会充当可预测的“箱式”结构,并且在大地震之后的行为将是不可预测的,并且可能导致外墙的损失。本文涉及现有建筑物的评价和多次加强计划的发展,最后讨论了具有结构细节的建议加强计划。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号