The Immersed Tunnel in Bjorvika. Presentation of Environmental Challenges and Measures

机译:Bjorvika的浸没的隧道。介绍环境挑战和措施

获取原文

摘要

Building the first planned immersed tunnel in Norway, give birth to environmental challenges different from other road projects in Norway so far. The masses that have to be removed and deposited to make space for the tunnel elements are of very different type and degree of contamination. This is due to natural conditions and prior activities in the area. Further, the chance to find boats or constructions protected by the Cultural Heritage Act is quite high in part of the area for the proposed road track. Environmental goals are set for all parts of the project and integrated in a separate environmental program. The program will be followed up through an own steering system.
机译:到目前为止,建立挪威的第一个计划的浸入隧道,从挪威的其他道路项目中出生。必须被移除和沉积以使隧道元件的空间的质量非常不同,污染程度非常不同。这是由于该地区的自然条件和现有活动。此外,找到由文化遗产行为保护的船只或建筑的机会在拟议的道路轨道的部分地区非常高。为项目的所有部分设定环境目标,并集成在单独的环境计划中。该计划将通过自己的转向系统进行跟进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号