首页> 外文会议>Semiconductor Manufacturing Technology Workshop >Using simulation and daily-demand method to analyze the capacity utilization for product-mix in semiconductor fabrication
【24h】

Using simulation and daily-demand method to analyze the capacity utilization for product-mix in semiconductor fabrication

机译:利用仿真和日常需求方法分析半导体制造中产品混合的能力利用率

获取原文

摘要

This paper focuses on how to use Daily-Demand Method (DDM) to translate a simulation model into a capacity analysis model, which can be manipulated on finding the maximum capacity of product-mix, prediction of bottlenecks and optimization of capacity. Using DDM not only can consider the variant limitations of semiconductor fabrication but also improve the run time of simulation. In comparison to a steady-state simulation, DDM can save time from hours to less than 10 minutes. This methodology has successfully implemented at MXIC Fab-2 from Jul 2002. In this paper, we provide several examples of Fab-2's application, as well as the findings of capacity utilization.
机译:本文重点介绍如何使用日常需求方法(DDM)将仿真模型转化为容量分析模型,可以在找到产品混合的最大容量,瓶颈预测和能力优化的最大容量上进行操作。使用DDM不仅可以考虑半导体制造的变体限制,而且可以改善模拟的运行时。与稳态仿真相比,DDM可以将时间从小时省略到不到10分钟。该方法已成功于2002年7月在7月2日在7月2日实施。在本文中,我们提供了几个例子的Fab-2的应用程序,以及能力利用的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号