首页> 外文会议>Joint Conference on Knowledge-Based Software Engineering >Bridging Knowledge Gaps in Engineering Companies - The Case of Pipeline River Crossings in Greece
【24h】

Bridging Knowledge Gaps in Engineering Companies - The Case of Pipeline River Crossings in Greece

机译:在工程公司桥接知识差距 - 希腊管道河流过境的情况

获取原文

摘要

The introduction of Knowledge Management (KM) processes is suggested herein for bridging knowledge gaps observed during long-term and high complexity engineering projects, like the Natural Gas Project (NGP) of Greece, with a view to deploying a dedicated KM system in engineering companies. The model of three essential knowledge management processes (acquisition, maintenance and sharing) is demonstrated, applying the IDEF0 method of functional analysis and design. The functionality of the introduced KM processes has been proved by a case study referring to a pipeline river crossing sub-project.
机译:在此提出知识管理(km)流程的推出在此建议用于在长期和高复杂性工程项目中观察到的桥接知识差距,如希腊的天然气项目(NGP),以便在工程公司部署专用km系统。证明了三种基本知识管理进程(采集,维护和共享)的模型,应用了功能分析和设计的IDEF0方法。通过案例研究证明了推出了KM流程的功能,这是指管道河流交叉子项目的研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号