首页> 外文会议>International symposium on field measurements in geomechanics >Rock stress measurement for limestone open pit mine
【24h】

Rock stress measurement for limestone open pit mine

机译:石灰石露天矿的岩石应力测量

获取原文

摘要

In this paper, the results of which rock stress measurement was performed by the Compact Conical-ended Borehole Overcoring (CCBO) technique at Torigata Limestone Mine are discussed, comparing with those analyzed by back analysis using 3-D finite element method. It is shown that the horizontal initial stress component cannot be disregarded to estimate the stability of rock slope even in the case that the limestone mine is located near the top of a mountain.
机译:在本文中,讨论了在Torigata石灰石矿的紧凑圆锥形圆孔超细煤(CCBO)技术进行了岩石应力测量的结果,与使用3-D有限元法分析的那些进行比较。结果表明,即使在石灰石矿位于山顶附近,仍然不能忽略水平初始应力分量以估计岩石斜率的稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号