首页> 外文期刊>Engineering Geology >Rock stress measurements and the state of stress at an open-pit limestone mine in Japan
【24h】

Rock stress measurements and the state of stress at an open-pit limestone mine in Japan

机译:日本露天石灰岩矿山的岩石应力测量和应力状态

获取原文
获取原文并翻译 | 示例
           

摘要

A series of rock stress measurements is performed to estimate the states of local paleostress and present (in situ) stress at the Torigata open-pit limestone mine in Japan using the calcite strain gauge (CSG) technique and the compact conical-ended borehole overcoring (CCBO) technique, respectively. A set of back and forward numerical analyses is then carried out to evaluate the states of regional and local present stresses and the mine-induced rock slope stability using a three-dimensional finite element model and the state of local present stress measured by the CCBO technique. The results of rock stress measurements from this and other studies suggest that the maximum principal stress direction in the study area has rotated counterclockwise from the southeast (NW-SE trend) to the northeast (NE-SW trend) since the late Cretaceous period up to the present time. The results of the back analysis show that the directions of the horizontal principal regional tectonic stresses obtained by the back analysis are in good agreement with those of the horizontal principal local in situ stresses measured by the CCBO technique. However, the horizontal regional tectonic stresses are more compressive than the horizontal local in situ stresses. It results from the fact that the horizontal regional stress due to gravity is not considered in the back-analyzed horizontal regional tectonic stress, but it is included in the local in situ stress measured by the CCBO technique. The results of the forward analysis show that the local stress obtained by the forward analysis, especially its horizontal components, is in good agreement with the horizontal local in situ stress measured by the CCBO technique, and that the magnitude of the vertical normal stress increases more rapidly than those of the horizontal normal stresses with depth. As a result, the ratio of the horizontal normal stress to the vertical normal stress is largest at the current excavation level (ground surface) and decreases with depth. It means that the stress field within the mine-induced rock slope is strongly affected by the horizontal components of the local in situ stress.
机译:使用方解石应变仪(CSG)技术和紧凑的圆锥形端部井眼超采锥度,对日本Torigata露天石灰岩矿山进行了一系列岩石应力测量,以估计局部古应力状态和当前应力(原位) CCBO)技术。然后进行一组前后数值分析,以使用三维有限元模型评估局部和局部当前应力状态以及矿山诱发的岩石边坡稳定性,并通过CCBO技术测量局部当前应力状态。 。这项研究和其他研究的岩石应力测量结果表明,自白垩纪晚期至直到今天,研究区的最大主应力方向已从东南(NW-SE趋势)向东北(NE-SW趋势)逆时针旋转。现在的时间。反演结果表明,反演得到的水平主区域构造应力方向与CCBO技术测得的水平主局部原地应力方向一致。但是,水平区域构造应力比水平局部原地应力更具压缩性。这是由于在重力分析的水平区域构造应力中未考虑重力引起的水平区域应力,而是将其包含在通过CCBO技术测得的局部原地应力中。正向分析的结果表明,通过正向分析获得的局部应力,特别是其水平分量,与通过CCBO技术测得的水平局部原位应力非常吻合,并且垂直法向应力的大小增加了更多。比具有深度的水平法向应力要快。结果,水平法向应力与垂直法向应力之比在当前开挖水平(地表)处最大,并随深度减小。这意味着矿山诱发的岩石边坡内的应力场受到局部原地应力水平分量的强烈影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号