首页> 外文会议>Process control, electrical information conference ISA PUPID annual symposium >Real Time grade costing - the use of process data for cost modeling
【24h】

Real Time grade costing - the use of process data for cost modeling

机译:实时等级成本 - 使用过程数据进行成本建模

获取原文

摘要

If manufacturing activities are properly identified, measured and related to the resources they consume, we are better able to understand the costs associated with the activities being performed. And, if the manufacturing activities being measured can be related to the production of a specific product, we can begin to understand the costs related to the production of that product. This understanding of the relationship between activities performed and resources consumed allows mill managers, operators, and planners to carefully organize the execute the manufacturing activities required to produce a given product with full knowledge of all costs which will be incurred. This understanding also facilitates accurate prediction of the financial consequences of performing an activity long before the activity is actually performed. Further, by measuring and analyzing the value associated with an activity and its associated cost, we are often able to identify resource consuming activities which may be eliminated from the manufacturing process.
机译:如果妥善确定制造活动,衡量和与他们消费的资源有关,我们更能够了解与正在执行的活动相关的成本。并且,如果正在测量的制造活动可能与特定产品的生产有关,我们可以开始了解与该产品的生产相关的成本。这种了解所做活动之间的关系和消耗的资源允许磨机管理人员,运营商和规划者仔细组织执行制造所需的制造活动,以全面了解将产生的所有成本。这种理解还促进了准确预测在实际执行活动之前长期执行活动的财务后果。此外,通过测量和分析与活动相关的值及其相关成本,我们通常能够识别可以从制造过程中消除的资源消耗活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号