首页> 外文会议>International Conference on Environmental Systems >Performance of the Extravehicular Mobility Unit (EMU) Airlock Coolant Loop Remediation (A/L CLR) Hardware Phase II
【24h】

Performance of the Extravehicular Mobility Unit (EMU) Airlock Coolant Loop Remediation (A/L CLR) Hardware Phase II

机译:象限性迁移率单位(EMU)气锁冷却液回复(A / L CLR)硬件阶段II的性能

获取原文

摘要

An EMU water processing kit (Airlock Coolant Loop Recovery - A/L CLR) was developed as a corrective action to Extravehicular Mobility Unit (EMU) coolant flow disruptions experienced on the International Space Station (ISS) in May of 2004 and thereafter. Conservative schedules for A/L CLR use and component life were initially developed and implemented based on prior analysis results and analytical modeling. The examination of post-flight samples and EMU hardware in November of 2006 indicated that the A/L CLR kits were functioning well and had excess capacity that would allow a relaxation of the initially conservative schedules of use and component life. A relaxed use schedule and list of component lives were implemented thereafter. Since the adoption of the relaxed A/L CLR schedules of use and component lives, several A/L CLR kit items, transport loop water samples and sensitive EMU transport loop components have been examined to gage the impact of the relaxed requirements. The intent of this paper is to summarize the findings of that evaluation, and to outline updated schedules for A/L CLR use and component life.
机译:鸸鹋水冲洗套(气闸冷却剂回路恢复 - A / L CLR),作为一个纠正措施来经历了国际空间站(ISS)于2004年及此后的五月舱外移动单元(EMU)冷却液流动失常。对于A / L CLR使用和部件寿命保守调度最初开发和基于先前分析结果和分析建模实现。飞行后的样品,并在2006年11月EMU硬件的检查表明,在A / L CLR试剂盒均运作良好,并有产能过剩,将允许使用和部件的使用寿命的早期保守时间表的放松。一个轻松的使用进度和组件的生命入榜后实施。自从通过使用和组件的生活,几个A / L CLR套件项目,交通循环水样和敏感的动车组运输循环部件的宽松A / L CLR时间表加以审查的规的宽松要求的影响。这样做的目的本文是总结了评估的结果,并概述了A / L CLR使用和部件的使用寿命更新时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号