首页> 外文会议>Ironmaking conference of the Iron and Steel Society >BLAST FURNACE PROCESS MEASUREMENT AT DOFASCO
【24h】

BLAST FURNACE PROCESS MEASUREMENT AT DOFASCO

机译:Dofasco的高炉过程测量

获取原文

摘要

Dofasco's project plan to optimize furnace performance consisted of 4 major steps: 1) Determination of the critical process measurements by examining their impact on a two stage heat and mass balance. 2) Improvement of these process control and monitoring sensors to allow accurate and timely evaluation of raw material and operating changes. 3) Establishment of monitoring techniques to maintain the quality of the data. 4) Improvement of the process by implementing new technology where economically feasible to further stabilize the operation. Dofasco's long term goal is to continue to optimize the Iron making process. Automation and sensor improvements will be an integral part of the overall plan.
机译:Dofasco的项目计划优化炉子性能由4个重要步骤组成:1)通过检查其对两级热量和质量平衡的影响来确定关键过程测量。 2)改进这些过程控制和监测传感器,以便准确和及时地评估原材料和操作变化。 3)建立监测技术,以维持数据的质量。 4)通过在经济上可行的新技术进一步稳定运作的新技术来改善该过程。 Dofasco的长期目标是继续优化铁制造过程。自动化和传感器改进将是整体计划的一个组成部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号