The first 132 kV XLPE cable in South Africa was installed in 1975/76 at Boksburg near Johannesburg. As a result of the experience gained in this plant, which was commissioned in 1979, it was decided at the planning stage of a second similar installation to purchase a fully type tested system of cable and accessories from one manufacturer and to carry out an AC after laying test. A transportable series resonant AC test set was purchased which operated at 50 Hz and was capable of testing up to 2 km of 132 kV cable at twice working voltage. Each 132 kV cable circuit on the second plant was tested at 140 kV, the highest voltage the manufacturer of the SF/sub 6/ switchgear would allow. Each circuit was tested for a period of 15 minutes. No failures occurred in test and there have been no failures of either cable or accessories since the plant was commissioned in 1981.
机译:南非的第一个132 kV XLPE电缆于1975/76年安装在约翰内斯堡附近的Boksburg。由于该工厂中获得的经验,该植物于1979年委托,它在第二类类似安装的规划阶段决定购买一家制造商的全型电缆和配件的全型测试系统,并在后面进行一次铺设测试。购买可运输的系列谐振交流试验套装,其在50 Hz下运行,能够在两次工作电压下测试高达2公里的132千伏电缆。第二设备上的每台132 kV电缆电路在140 kV下测试,最高电压SF / SUS 6 / Switchgear的制造商将允许。每个电路都经过15分钟的时间测试。测试中没有发生故障,并且由于工厂于1981年委托,因此无需电缆或附件的故障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号