Development of Work Activity Matrix for Microtunnel Quality Assurance, Inspection, and Risk Management during Construction

机译:建设中的Microtunnel质量保证,检查和风险管理的工作活动矩阵的开发

获取原文
获取外文期刊封面目录资料

摘要

Initial microtunnel inspection reports were in the form of daily journals consisting of descriptive sentences and paragraphs with recurring but updated project-mandated information such as date, weather, temperature, equipment, and crew size. The daily journal presented a narrative of work activities performed to advance the microtunnel boring machine (MTBM) including length of tunnel excavated, number of pipes installed, observation of excavated soil material discharge at the soil separation plant, estimated units installed for schedule of values computation for monthly pay estimates, and actualized work completed for monthly construction schedule update. Except for numerical data input, daily microtunnel reports were lengthy with varying writing styles.The introduction of desktop computers in the early 1990s alleviated many of the challenges associated with handwritten reports. The inspection record keeping for microtunneling construction projects has evolved into a quality management and risk management tool based on lessons learned and the need for tracking additional parameters.This paper presents the development of a microtunnel inspection management plan for documenting quality assurance, tracking progress, resolving challenges, and following up on nonconforming work to ensure the project is completed in accordance with the contract documents. The focus herein is on the evolution of this microtunnel inspection management plan, reporting processes, and procedures into a standardized reporting template to capture relevant project data. This template serves as a training module for developing a work activity matrix (WAM) for microtunneling inspection and risk management applicable to small, medium, and large-diameter pipeline installation in different ground conditions.
机译:初始Microtunnel检验报告以每日期刊的形式,包括描述性句子和具有经常性的段落,但更新的项目授权信息,如日期,天气,温度,设备和船员尺寸。每日期刊介绍了在挖掘微管镗床(MTBM)的工作活动的叙述,包括隧道的长度,安装的管数,在土壤分离设备上观察挖掘土壤材料放电,安装了价值表的估计装置对于每月薪酬估算,并为每月施工进度更新完成的实际工作。除数字数据输入外,每日MicroTunnel报告冗长,写入样式不同。在20世纪90年代初推出桌面电脑减轻了许多与手写报告相关的挑战。基于经验教训以及跟踪附加参数的需要,对Microtunneling建筑项目的检查记录已进化为质量管理和风险管理工具。本文介绍了微管检测管理计划,以便记录质量保证,跟踪进度,解决挑战,以及跟进不合格的工作,以确保项目按照合同文件完成。本文的重点是在标准化报告模板中的这种微管检查管理计划,报告过程和程序的演变,以捕获相关的项目数据。该模板用作用于开发工作活动矩阵(WAM)的培训模块,用于微管状检查和适用于不同地面条件的小型,中型和大口径管道安装的风险管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号