首页> 外文会议>International Road Federation XIIIth world meeting >HIGHWAY 407 ETR - EXPRESS TOLL ROUTE QUALITY MANAGEMENT DEVELOPMENT AND IMPLEMENTATION OF QUALITY CONTROL AND QUALITY ASSURANCE PROCEDURES FOR MATERIALS AND CONSTRUCTION
【24h】

HIGHWAY 407 ETR - EXPRESS TOLL ROUTE QUALITY MANAGEMENT DEVELOPMENT AND IMPLEMENTATION OF QUALITY CONTROL AND QUALITY ASSURANCE PROCEDURES FOR MATERIALS AND CONSTRUCTION

机译:高速公路407号ETR-特长收费路线质量管理的发展和材料和施工质量控制和质量保证程序的实施。

获取原文
获取原文并翻译 | 示例

摘要

The design-build construction of the Highway 407 ETR - Express Toll Route (Highway 407)rnrequired the development and implementation of a comprehensive quality management plan torncontrol the quality of materials and construction for the project. End result specifications existrnfor many aspects of Ontario highway construction, with quality control (QC) normally thernresponsibility of the contractor/supplier and statistical quality assurance (QA) carried out by thernagency.rnFor the Highway 407 project, the QC and QA functions were integrated as part of arncomprehensive quality management plan that includes, in addition to materials andrnconstruction, design and environmental aspects. All QC/QA inspection and testing activities arernadministered by the Canadian Highways International Corporation (CHIC) QA Manager, withrntest results managed and electronically reported using quality management softwarernspecifically developed for the project. Construction inspections are carried out by specialistrninspectors from CHIC and sub-consultants, with QA testing completed by certified,rnindependent construction materials testing laboratories.rnThe philosophy adopted by CHIC for overall quality management of the Highway 407 projectrnis outlined. Development of the QC/QA procedures is described, including the testing plansrnand acceptance procedures, the development of the test result database and the interactionrnamong CHIC, the owner/agency and its independent agent. The role of the owner/agency - thernOntario Transportation Capital Corporation - is also described, with comments provided on thernquality management plan from the owner's perspective.
机译:407 ETR高速收费公路(407高速公路)的设计建造需要制定和实施全面的质量管理计划,以控制项目的材料和施工质量。在安大略省高速公路建设的许多方面都存在最终结果规范,通常由质量控制(QC)负责承包商/供应商的责任和由政府机构进行统计质量保证(QA)。对于407号高速公路项目,QC和QA功能已集成为综合质量管理计划的一部分,除了材料和施工,设计和环境方面,还包括其他内容。所有QC / QA检验和测试活动均由加拿大公路国际公司(CHIC)的质量检查经理进行管理,对测试结果进行管理,并使用专为该项目开发的质量管理软件进行电子报告。施工检查由CHIC和顾问的专业检查员进行,QA测试由经过认证的独立建筑材料测试实验室完成。CHIC概述了407号公路项目整体质量管理所采用的理念。描述了QC / QA程序的开发,包括测试计划和验收程序,测试结果数据库的开发以及CHIC,所有者/机构及其独立代理人之间的互动。还描述了所有者/机构(安大略运输资本公司)的角色,并从所有者的角度对质量管理计划进行了评论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号