首页> 外文会议>SPIE Astronomical Telescopes + Instrumentation Conference >Risk management system at Gemini Observatory
【24h】

Risk management system at Gemini Observatory

机译:双子座天文台的风险管理系统

获取原文

摘要

One of the challenges in implementing an effective enterprise risk management system is establishing a common set of processes, tools, and standard terminology. The risk management system recently implemented at Gemini Observatory operates at four connected levels: project, program, division, and observatory, using a common set of processes, tools, templates and standard terminology. The risk management process flow begins with the leader of the corresponding level writing a risk management plan outlining the process for the size and type of the project, roles and responsibilities, budgeting, timing, risk tolerances, and reporting for that specific level. Within the actual managing of risks, the leader of each level performs risk identification, risk assessment, internal risk controls evaluation, mitigation planning, contingency planning, risk monitoring (includes mitigation and contingency plan execution as needed), and risk closure in collaboration with appropriate staff. Risk categories used for project, program, and division risks are subcategories of the Observatory risk categories of strategic, operational, financial, and compliance. The same risk register template is used for all levels modified only for the specific categories required for each level. The risk register displays a risk score based on impact and likelihood ratings on a five by five matrix. All risk registers require that internal controls be evaluated for reducing risk, that mitigation and contingency plans are created, and costs are estimated. Finally, staff are trained in risk management through a set of training modules designed for the system. This paper describes in detail the risk management system implemented at Gemini Observatory and discusses the first four months of use.
机译:实施有效的企业风险管理系统的挑战之一是建立一套通用的流程,工具和标准术语。最近在双子座天文台实施的风险管理系统在四个连接的级别上运行:项目,程序,部门和天文台,使用一套通用的流程,工具,模板和标准术语。风险管理流程始于相应级别的负责人,该团队编写了一个风险管理计划,概述了该项目的规模和类型,角色和职责,预算,时间,风险容忍度以及该特定级别的报告。在实际的风险管理中,每个级别的领导者均会与相关人员协作执行风险识别,风险评估,内部风险控制评估,缓解计划,应急计划,风险监控(包括根据需要执行缓解和应急计划)以及风险关闭职员。用于项目,计划和部门风险的风险类别是天文台战略,运营,财务和合规性风险类别的子类别。对于仅针对每个级别所需的特定类别进行修改的所有级别,都使用相同的风险登记模板。风险记录在五乘五的矩阵上显示基于影响和可能性等级的风险评分。所有风险登记册均要求评估内部控制以降低风险,制定缓解和应急计划并估算成本。最后,通过针对系统设计的一套培训模块,对员工进行了风险管理方面的培训。本文详细描述了在双子座天文台实施的风险管理系统,并讨论了使用的头四个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号