首页> 外文会议>IEEE Conference of Russian Young Researchers in Electrical and Electronic Engineering >Optimization of Gas Engine Power Plant Operation Based on Study of Starting Conditions of a Powerful Motor Load
【24h】

Optimization of Gas Engine Power Plant Operation Based on Study of Starting Conditions of a Powerful Motor Load

机译:基于强大电机负荷启动条件的燃气发电厂运行优化

获取原文

摘要

The issues of transient stability and other disturbances caused by direct and smooth (reduced-current) starts of powerful induction motors in autonomous electric power system that supplies to oil pumping station and has generators and gas engine units, which are commensurate with the load, are considered. Analysis to determine maximum power of induction motor during direct starts is performed. It is noted that direct start-up of powerful induction motors is accompanied with large currents, which in turn cause significant decrease of voltages on load buses. The options based on step change of voltage and smooth start using polynomial functions of speed are proposed. Algorithm has been developed to optimize soft start of motor, based on minimum electromagnetic torque, taking into account values of current limits and starting time.
机译:瞬态稳定性和其他扰动引起的直接和光滑(减少)的扰动,在自动电力系统中的强大的感应电动机,供应到油泵站,并具有与负载相称的发电机和燃气发动机单元经过考虑的。分析以确定直接开始期间感应电动机的最大功率。值得注意的是,强大的感应电机的直接启动伴随着大型电流,这反过来又导致负载总线上的电压显着降低。提出了基于电压阶跃变化的选项和使用速度多项式函数的平滑开始。已经开发出算法以基于最小电磁扭矩优化电动机的软启动,考虑到电流限制和开始时间的值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号