The City of Fresno was facing a dire water supply future before maneuvering the political climate to pass a necessary water rate increase that allowed the City to move forward with the design and construction of a new 80 mgd Southeast Surface Water Treatment Facility (SESWTF). The water rate increase, and the capital budgets assumed that raw water to the plant would be delivered the way it has traditionally, through existing irrigation canals. However, the existing irrigation canal identified to convey water to the site was historically a riparian corridor where the furthest reaches upstream and downstream were channelized by the Fresno Irrigation District. The thickly vegetated, winding riparian corridor, created concerns with water quality permitting agencies, and the extensive amount of tree removal required to provide access roads for water quality monitoring created a situation where it was increasingly apparent that the irrigation canal was going to create significant cost, environmental, and permitting constraints. The design team needed to develop a pipeline alternative quickly to keep the treatment plant project on schedule. Carollo conducted an alternatives evaluation to determine the cost comparison for pipeline alternatives relative to the costs of the required improvements for environmental mitigation, quality control improvements, and the unknown of permitting.
机译:弗雷斯诺市在应付政治气候以通过必要的水费上涨之前面临着可怕的供水未来,这使弗雷斯诺市得以设计和建造新的80 mgd东南地表水处理设施(SESWTF)。水费的增加,以及资本预算假定原厂的水可以通过传统的方式通过现有的灌溉渠以传统方式输送。但是,从历史上看,现有的确定为将水输送到该地点的灌溉渠是一条河岸走廊,其中最远的上游和下游是由弗雷斯诺灌溉区引导的。植被茂密,蜿蜒的河岸走廊,引起水质许可机构的关注,为提供水质监测通道而需要大量砍伐树木,这造成了越来越明显的灌溉渠将要付出高昂成本的情况。 ,环境和许可限制。设计团队需要快速开发管道替代方案,以确保污水处理厂项目按计划进行。 Carollo进行了替代方案评估,以确定管道替代方案的成本与环境缓解所需的改进成本,质量控制改进以及未知的许可成本之间的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号