首页> 外文会议>ASCE international workshop on computing in civil engineering >Sensor-Based Resource Tracking for Monitoring the Progress of Rebar Installation
【24h】

Sensor-Based Resource Tracking for Monitoring the Progress of Rebar Installation

机译:基于传感器的资源跟踪,用于监控钢筋安装进度

获取原文

摘要

Traditional paper-based methods for construction activity monitoring are inefficient and error-prone. In this paper, an automated approach is proposed for monitoring the progress of construction activities by tracking major construction equipment and bulk material, using sensor-based technologies. Data obtained from sensor-based technologies will be fused to determine the completed steps of the activities, and consequently to identify the overall progress of the activities. Also, human-generated data, such as daily site reports, will be used to support the sensor data. A rule-based approach is developed for fusion of the collected data. This paper describes the initial field tests that were performed to monitor the rebar installation activity at a pilot construction site. To collect data about the ongoing rebar installation activity, the embedded sensors (e.g., position and load sensors) of a tower crane anti-collision system, and the site reports and quantity takeoffs were used. Initial results show that the developed approach can estimate the progress of rebar installation activity with 98% accuracy.
机译:施工活动监测的传统纸质方法效率低,容易出错。本文采用了一种自动化方法,用于使用基于传感器的技术跟踪主要建筑设备和散装材料来监测施工活动的进展。从基于传感器的技术获得的数据将被融合以确定活动的完成步骤,从而确定活动的整体进度。此外,人生成的数据(例如日常网站报告)将用于支持传感器数据。开发了一种基于规则的方法,用于融合所收集的数据。本文介绍了在试点施工现场监控钢筋安装活动的初始现场测试。要收集有关正在进行的钢筋安装活动的数据,使用塔式起重机防撞系统的嵌入式传感器(例如,位置和负载传感器)以及站点报告和数量起飞。初始结果表明,发达的方法可以估计钢筋安装活动的进度,精度为98%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号