首页> 外文会议>SAVE value summit >IMPROVEMENT of the Evaluation Method for VE Alternatives using the Risk Assessment Process
【24h】

IMPROVEMENT of the Evaluation Method for VE Alternatives using the Risk Assessment Process

机译:利用风险评估过程改进VE替代品评价方法

获取原文

摘要

Value engineering (VE) is one of the fundamental techniques of the construction management, and it is part of a systematic effort devoted to the functional analysis of facilities designed to achieve the necessary functions at a minimum life cycle cost. Since the success or failure of VE projects depends on the participants' capabilities, it is important to follow systematic procedures. However, although an alternative is suggested in accordance with the current VE procedures in the actual VE task, very often the case is that the alternative is not executed in the following stages, but instead reverts to the original plan. This seems to imply that VE alternatives are not specifically analyzed and evaluated in terms of risk management basis. In this regard, this study proposed a risk assessment process that can systematically analyze the VE alternatives to improve the efficiency of tasks through the prevention of returning alternatives in VE improvement activities. The procedures of this study are as follows. A total of 20 VE results reports were analyzed while expert interviews were performed to analyze VE application status. Based on the results, the problems of evaluation on the VE alternatives were derived, and four improvement directions were set to solve them. Following this, a risk assessment process for VE alternatives was proposed through the introduction of risk assessment procedures, specific factor analysis of the alternatives and IPA techniques. Then, their applicability was verified by applying the proposed risk assessment process for VE alternatives to actual cases and performing expert interviews. The verification results confirmed that the efficiency of VE tasks could be improved by reducing the repetitive work for the returning alternatives.
机译:价值工程(VE)是施工管理的基本技术之一,它是一个系统努力,旨在以最低生命周期成本实现必要功能的设施功能分析的一部分。由于VE项目的成败取决于参与者的能力,因此重要的是遵循系统的程序。但是,虽然根据实际VE任务中的当前VE程序建议了替代方案,但通常情况是替代方案未在以下阶段执行,而是恢复到原始计划。这似乎暗示未在风险管理范围内专门分析和评估ve替代方案。在这方面,本研究提出了一种风险评估过程,可以通过预防VE改善活动的回报替代方案来系统地分析VE替代方案以提高任务效率。本研究的程序如下。共分析了20 VE结果,而专家访谈进行分析以分析VE申请状态。基于结果,得出了VE替代品评估的问题,并设定了四个改进方向来解决它们。在此之后,通过引入风险评估程序,替代品和IPA技术的具体因素分析,提出了VE替代方案的风险评估过程。然后,通过将拟议的风险评估过程应用于实际案件和执行专家访谈,验证了他们的适用性。验证结果证实,通过减少返回替代品的重复工作,可以提高VE任务的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号