首页> 外文会议>Underground construction technology international conference exhibition >BACHMAN INTERCEPTOR: MICROTUNNELING A 48-INCH SEWER AROUND AN URBAN LAKE
【24h】

BACHMAN INTERCEPTOR: MICROTUNNELING A 48-INCH SEWER AROUND AN URBAN LAKE

机译:巴赫曼访谈录:在城市湖泊周围微缩一个48英寸的下水道

获取原文
获取外文期刊封面目录资料

摘要

PROJECT DESIGN TEAM 1. Owner: Dallas Water Utilities 2. DWU Project Manager: ErickSteitle 3. KBR Project Manager: Khidir Hamad, PE 4. KBR Scapegoat: Troy Hotchkiss, PE PROJECT CONSTRUCTION TEAM 5. Contractor: Southland Contracting Inc. 6. Owner CM: ErickSteitle 7. Inspectors: City and 3rd party CE&I Staff GENESIS-HISTORY 8. Bachman Dam Rehabilitation 9. Lower Bachman SSES 10. Comprehensive Wastewater Collection System Assessment 11. Overlapping Priorities and Infrastructure Renewal Needs.
机译:项目设计团队1.所有者:Dallas Water Utilities 2. DWU项目经理:ErickSteitle 3. KBR项目经理:PE Khidir Hamad 4. KBR替罪羊:PE项目建设团队Troy Hotchkiss 5.承包商:Southland Contracting Inc. 6.所有者CM:ErickSteitle 7.检查员:城市和第三方CE&I员工概述-历史8. Bachman大坝修复9.下Bachman SSES 10.综合废水收集系统评估11.优先重点和基础设施更新需求重叠。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号