首页> 外文会议>IEEE Aerospace Conference >MAVEN relay operations
【24h】

MAVEN relay operations

机译:MAVEN中继操作

获取原文

摘要

The Mars Atmosphere and Volatile EvolutioN (MAVEN) mission launched in late 2013 and began commissioning operations in September 2014 following a 10 month cruise to Mars. The Mission will study the upper atmosphere of the planet. In addition to the science instruments, the MAVEN spacecraft is equipped with an Electra UHF transceiver to support relay communication with landed assets. This paper describes how the UHF relay service was developed and validated through assembly test and launch operations (ATLO) as well as during cruise to, and transition into, Mars orbit. The discussion includes a description of the various functional and thread tests conducted during ATLO, a description of checkout activities during Cruise, a ground-based operational readiness test to simulate a future contact with the Mars Science Laboratory (MSL) rover, and a description of an actual overflight with MSL during the Transition phase.
机译:火星大气和挥发份(MAVEN)任务于2013年底启动,并在经过10个月的火星航行后于2014年9月开始试运行。特派团将研究地球的高层大气。除科​​学仪器外,MAVEN航天器还配备了Electra UHF收发器,以支持与着陆资产的中继通信。本文介绍了如何通过组装测试和发射操作(ATLO)以及在巡航和过渡到火星轨道的过程中开发和验证UHF中继服务的方式。讨论内容包括对ATLO期间进行的各种功能和线程测试的描述,Cruise期间结帐活动的描述,模拟未来与火星科学实验室(MSL)漫游车接触的地面操作准备测试,以及对以下内容的描述:在过渡阶段使用MSL进行实际飞越。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号